Warwick Highway Weekly Log September 22 - 28, 2014 Mon. Sept. 22 Patching Revere Hill Rd Tues. Sept. 23 Finish patching on Revere hill Rd. Patching on Northfield Rd. Called Bartlett Consolidated as to the schedule for the Hockanum Rd. Bridge and guardrail repair. Wed. Sept. 24 Brian Hubbard out sick Patching on Northfield Rd. Returned Rented Roller Checked culvert on Orange Rd. Met with Paving Supervisor from Warner Bros. about Winchester Rd. Thurs. Sept. 25 Brian Hubbard out sick Returned Message boards to Sheriff's Dept for the weekend due to prior reservation Worked on Paper work for WRRRP Grant reimbursement Went to Bass Rd. to clear beaver plug from culvert Washed loader Fri. Sept. 26 Went to Orange Rd. for shoulder work and repair washout by culvert Performed service on Truck 1 Performed service on Loader Worked on WRRRP Grant paper work Went to Bass Rd. to remove more of beaver plug in culvert Posted Winchester Rd. closure information for overlay paving project