Warwick Highway Weekly Log Sept. 10 - 16, 2012 Mon. Sept. 10 Crushed dumpsters at transfer station Began installing sub-drainage on easterly side of Hastings Heights Rd. Met with David on highway issues Tues. Sept. 11 Continued installing sub-drainage on Hasting Heights Rd. Wed. Sept. 12 Tim on vacation day Continued installing sub-drainage on Hastings Heights Rd. Thurs. Sept. 13 Continued installing sub-drainage on Hastings Heights Rd. Tim went on fire call Fri. Sept. 14 Continued installing sub-drainage on Hastings Heights Rd. Sat. Sept. 15 Received call from Shelburne Control at 11:30 P.M. about tree down near # 196 Old Winchester Rd. - personnel called in to remove tree out of road