Warwick Highway Weekly Log July 30 - Aug. 5, 2012 Mon. July 30 Placed HMA on Flower Hill Rd. repairs Marked out Hastings Heights Rd. drainage project Went to Winchester for parts and gas Met with resident about fence issue on Athol Rd. Spoke with David about highway issues Made welding repair to truck # 2 Tues. July 31 Replaced culvert # 28 on Old Winchester Rd. Wed. Aug. 1 Brian out sick Re-installed Robbins Rd. sign at Rt. 78 that was pulled out of the ground Continued pulling out old asphalt and finished digging out rocks on Flower Hill Rd. Met with David to go over highway issues Tim went on fire call Thurs. Aug. 2 Patched holes on Wendell Rd. near Moss Brook and continued putting HMA on Flower Hill Rd. Met with David on highway issues Fri. Aug. 3 Tim on vacation day Did oil change on Backhoe and other minor maintenance Smoothed out washboarding on Old Winchester Rd. and Robbins Rd. Cleaned out beaver debris on culverts by power line on Richmond Rd.