Warwick Highway Weekly Log Aug. 13 - 19, 2012 Mon. Aug. 13 Put hard pack and loam along edge of new pavement on Flower Hill Rd. Continued replacing worn out hydraulic hoses on Backhoe - went to Porter's Diesel for hoses Crushed dumpsters at transfer station Tues. Aug. 14 Finished loaming edges of Flower Hill Rd. Continued putting hard pack along edges of new pavement on Flower Hill Rd. Fixed washout on Buzzell Pl. and bottom of Beech Hill Rd. Cleaned out beaver debris on Richmond Rd. culvert Wed. Aug. 15 Tim went to Bay State Roads class in Northampton and picked up Backhoe parts in Whateley on way home Brought Loader to Randy's Truck for inspection sticker Worked on building new body plate for truck # 2 Placed rip rap as needed along new pavement on Flower Hill Rd. Dug out rock near # 344 Old Winchester Rd. Thurs. Aug. 16 Tim went to Tri-County Supt. meeting in Agawam Grade and rock raked far end of Gale Rd. due to washouts Replaced emergency brake assembly on Backhoe and replaced 2 hydraulic hoses on boom Fri. Aug. 17 Brian out sick today Continued putting hard pack along edges of new pavement on Flower Hill Rd. Met with homeowner on fence issues on Athol Rd. Met with David on highway issues