Warwick Highway Weekly Log Aug. 12 - 18, 2013 Mon. Aug. 12 Jim on vacation day Brian out sick Brought truck # 3 over to Wright's Welding in Athol for repair Began backing up road shoulders on Hastings Heights Rd. with loam where necessary Called BOH and beaver trapper about new beaver problem on Orange Rd. and continued problem on Northfield Rd. Met with David Young on highway issues Energy Committee came to highway garage with contractor to look at bidding for insulation job Tues. Aug. 13 Jim on vacation day Tim at Bay State Roads class in Northampton Checked all roads for storm damage Continued backing up shoulders on Hastings Heights Rd. with loam Loaded all metal in dumpster and crushed dumpsters at transfer station Wed. Aug. 14 Put in HMA on Orange Rd. where new culvert was put in last week and used remaining HMA on E. Wilson Rd. Thurs. Aug. 15 Tim on vacation day Finished rip rapping Hastings Heights Rd. and Athol Rd. Finished backing up shoulders on Hastings Heights Rd. and Athol Rd. with loam Fixed washouts on Quarry Rd., White Rd. and Chestnut Hill Rd. Fri. Aug. 16 Tim on vacation day HMA patched Athol Rd.