Warwick Highway Weekly Log August 11 - 17, 2014 Mon. Aug. 11 WRRRP patching Northfield Rd. Hamshaw Lumber to pick up lumber for storage building sill plates Work on installing sill plates on slab Repair tail light on truck 2 Tues. Aug. 12 Change date on Message boards to reflect weather delay Inspect culverts and clear away debris Check on beavers at Bass Rd. Finish installing Sill plates for storage building Wed. Aug. 13 Installed new hitch on Truck 1 Serviced Backhoe At 4 Pm Jim B. and Brian H. called in for trees down on Gale Rd & Old Winchester Rd. then at 5 Pm additional call to Flowerhill Rd. for tree down Thurs. Aug. 14 Checking roads for storm damage Cleared plugged culvert Quarry Rd. Cleaned up sand washed out of Wagon wheel campground driveway into road Fixed Buzzell Place with loader Delivered pipe to Winchester Rd. site for tomorrow's job Fri. Aug. 15 Closed Winchester Rd. (Rt. 78) Removed old drop inlet and outlet headwall Installed new culvert across the road Re-opened Rt. 78 to traffic at 3 pm Brought message boards back to Highway garage