Warwick Highway Weekly Log June 30 - July 6, 2014 Mon. June 30 Larry out vacation day Wash out repair on Old Winchester Rd. & Robbins Rd. Grade & Rake Old Winchester Rd. & Robbins Rd. Tues. July 1 Met with fire chief about Fire Station driveway Met with Brian Gale about Fire Station driveway Patching on Winchester Rd. Wed. July 2 Disassemble compactor to locate origin of part that fell out during operation Tues. Ordered parts for compactor Went to White Rd. to repair storm damage from last week Went to Old Winchester Rd. to clean out more culverts Called TNT Carports to cancel building order for delayed delivery and mailed certified letter to same also requested refund of deposit Thurs. July 3 Jim out vacation day Checking roads for damage from overnight storm Called Northfield Highway Dept. to tell them about tree down their side of Quarry Rd. Called National Grid to report tree on wires on Gale Rd. Repaired small wash out on Winchester Rd. Cleaning culverts and bleeders on Old Winchester Rd. Checked with Fairfields about truck 3, still not ready Fri. July 4 Holiday