Warwick Highway Weekly Log July 15 - 21, 2013 Mon. July 15 Jim on vacation day Installed 120 feet of 6-inch sub-drainage by house # 296 Athol Rd. Crushed dumpsters at transfer station Tues. July 16 Installed additional 80 feet of 6-inch sub-drainage by house # 296 Athol Rd. Began digging out ditch line on lower Chestnut Hill Rd. leading to culvert Wed. July 17 HMA patched Northfield Rd. Continued digging out ditch line on Chestnut Hill Rd. Swept Hastings Heights Rd. and portions of Athol Rd. to be paved Thurs. July 18 Jim on vacation day Continued HMA patching Northfield Rd. Met with Lane Construction to go over paving project that begins on Monday Delivered letters to residents on Hastings Heights Rd. about road closure beginning Monday for paving Finished digging out ditch line on Chestnut Hill Rd. Fri. July 19 Finished HMA patching Northfield Rd. Met with Karro Frost about conservation issues on a future project Met with David Young on highway issues Flushed culvert on Northfield Rd. with fire truck Replaced right rear brake chamber on truck # 3 Hauled 2 loads of old asphalt to G&S Lyman's pit in Orange