Warwick Highway Weekly Log July 14 - 20, 2014 Mon. July 14 Jim out vacation day Brian H. and Brian M. to Wendell Rd to begin repair to wash outs Larry to various places in town to check damages reported by residents the to Wendell Rd. to help with repairs Installed new part in compactor, found more possible troubles H.P. Fairfield returned new truck, we loaded with hardpack to test gate will not open with pressure against gate as in tailgate spreading gravel on roads Fairfield to send road mechanic tomorrow Tues. July 15 Worked on final bills for FY 2014 Returned calls from last week (no time Monday) Cleaned out bleeders on Old Winchester and White Rds. Went to Winchester Rd. to address issue of resident. H.P. Fairfield mechanic came to work on truck, tested after repair seemed to work as needed. Reserved right to require more repair if this does not cure the problem Wed. July 16 Report of tree or limb on barber hill Checking roads Cleaned up trees & limbs on various roads Cleaned out plugged culvert on Flower hill at Buzzell Pl. flushed with fire truck Went to Springfield to pick up brake pedal for loader Thurs. July 17 Installed new combination pintle hook ball hitch on truck 1 Installed new brake pedal in loader Went to repair wash out on Wendell Rd. Flipped cutting edge on loader bucket Crushed dumpsters at the transfer station Fri. July 18 WRRRP patching on Northfield Rd using rented roller WRRRP patching on Wendell Rd Trimmed brush by Hockanum bridge to improve sight line approaching bridge Removed hanging limbs on Wendell Rd. and Hockanum Rd.