Warwick Highway Weekly Log July 8 - 14, 2013 Mon. July 8 Larry on vacation all week HMA patched Hastings Heights Rd. Continued working on Grader repair Tues. July 9 Crushed dumpsters at transfer station Finished HMA patching Hastings Heights Rd. and did some on Athol Rd. Finished making repairs to Grader tilting console Cut down tree stubs in Gulf area for Tree Warden Wed. July 10 Dug out culvert on Flower Hill Rd. at Buzzell Pl. and rebuilt headwall over culvert Truck # 2 developed hole in fuel line - went to Porter's for part that had to be ordered - also dropped truck # 3 off to have brakes looked at Cut pavement on Bliss Hill Rd. for future culvert replacement Worked on filling out a Massworks Grant application Thurs. July 11 Cleaned up sand around Monument by Fellows Field Checked culverts on Winchester Rd. Cut down dangerous trees for Tree Warden Went to Porter's Diesel to pick up part Fri. July 12 Installed new fuel line in truck # 2 Cleaned out 2 culverts on Northfield Rd. plugged with beaver debris Cleaned off basin tops on Winchester Rd. Marked out roads with Dig Safe notification for future work Met with David Young on FEMA paperwork