Warwick Highway Weekly Log June 13 - 19, 2011 Mon. June 13 Crushed dumpsters at transfer station Cut down trees on Orange Rd. and started a portion of Northfield Rd. as well for Tree Warden Met with David Young to go over highway issues Received call from Shelburne Control at 11 P.M. of tree down on side of Northfield Rd. that was coned off by Police and can be cleaned up in the morning Tues. June 14 Finished cutting dead trees on Northfield Rd. including a tree that fell down last night along the edge of Rd. Removed spinner assembly from truck # 2 Replaced hydraulic hose on truck # 3 Rotated tires on truck # 4 Tim met with Conservation Commission on NOI for culvert replacements Wed. June 15 Tim on vacation day Installed culvert on dead end portion of Royalston Rd. Thurs. June 16 Cut down Japanese Knotweed on various roads in town Fixed washouts on Old Winchester Rd. and Winchester Rd. Replaced cutting edge on Loader Went to Hubbardston for Backhoe parts Fri. June 17 Jim out sick Bill on vacation day Brian on comp day Checked on beaver activity on various roads Went to Bernardston and Whately for parts