Warwick Highway Weekly Log June 9 - 15, 2014 Mon. June 9 Start fabrication of asphalt apron for truck 2 Finish apron for truck 3 Paint both aprons Haul remaining asphalt rubble to Porter's Tues. June 10 Brian H. out vacation day Check culvert on Winchester Rd and one on Old Winchester Rd. Dig out Inlet end of drop inlet on Winchester Rd. Flush culverts Winchester Rd. and Old Winchester Rd. Remove hanging branch on Athol Rd. Place Rip Rap in culvert inlet to stop erosion Take truck 2 to Pete's tire for new tires on front Wed. June 11 Brian H. out vacation day Pothole patching on Athol Rd. & Northfield Rd. Went to J&G's in Winchester to get gas for power equip. Met with Representative from Gorman Group about Winchester Rd. project Went to Winchester Rd. and cut down tree stub left by tree crew Thurs. June 12 Brian H. out vacation day Talked with Dana about tree issues Talked with Parker Brown about new truck tailgate latch repair Pulling shoulders on Winchester Rd. Fri. June 13 Brian H. out vacation day Jim B. out sick Met with Karro Frost about culvert on Winchester Rd. Went to Worcester to pick up truck 3 at H.P. Fairfields