Warwick Highway Weekly Log May 26 - June 1, 2014 Mon. May 26 Holiday Tues. May 27 Checked culvert on Winchester rd. Poured concrete slab for metal building Finished repair to radio in grader Located paper work for Beth Wed. May 28 Larry to Bay State Roads class Remove forms from Slab and grade around slab Check roads for damage from heavy rains Crushed dumpsters at transfer station Thurs. May 29 Pothole patching on Orange Rd. and Northfield Rd. Fri. May 30 Pole patching on Northfield Rd. Called to Check on delivery of metal Building