Warwick Highway Weekly Log April 28 - May 4, 2014 Mon. Apr. 28 Continued grading Cleaned up sand by parking area at Town hall Took down weight limit signs from dirt roads Tues. Apr. 29 Cleaning ditches on dirt roads prior to grading Met with Con Com about culvert replacement on Chestnut Hill Rd. Installed metal plate over culvert to prevent more damage during permitting Took new truck 3 to Lyman Signs to have lettered Wed. Apr. 30 Repaired broken light on grader Installed new helper spring pad on truck 2 Cleaned out truck parking bays Started paper work for culvert replacement on Chestnut Hill Rd. Thurs. May 1 Chase Hill Rd. clean out ditch line to remove water from the road Picked up new truck 3 from Lyman Signs Chestnut Hill Rd fixed small wash out to prevent more damage Removed ripper shanks on grader to replace worn shank caps Worked on culvert replacement paper work Fri. May 2 Brian H. out Chase Hill Rd. to finish cleaning ditch line To Chestnut Hill Rd. to take pictures and measurements of culvert