Warwick Highway Weekly Log May 5 - 11, 2014 Mon. May 5 Jim out comp time Installed new shank caps on Grader scarifier Checked Old Winchester Rd for grading is still to wet Beech Hill Rd. to remove rocks that interfere with grading and plowing, filled holes with hard pack gravel Worked on cleaning ditch line on Gale Rd Larry attended ATM Tues. May 6 Install new caster wheel assembly onto sweeper Continue work on ditch line on Gale Rd. Sweeping Larry attended Con com meeting Wed. May 7 Continue work on ditch line on Gale Rd. Continue sweeping Thurs. May 8 Finished sweeping Cleaned up Truck 2 from sweeping Continued work on ditch line on Gale Rd. Started hand sweeping of bridge on Orange Rd. Fri. May 9 Brian H. out Clean up sand Moss brook bridge on Wendell Rd. , had to quit due to rain Loader to Hastings Pond Rd. to temporarily smooth dirt at end of pavement Started prepping area for metal building Washed new Truck 3