Warwick Highway Weekly Log Apr. 23 - 29, 2012 Mon. Apr. 23 Began grinding and repairing truck # 3 cab Brought truck # 2 to Pete's Tire for new right front tire Repaired and re-installed Buzzell Pl. sign Tues. Apr. 24 Continued working on truck # 3 cab Tim went to meeting in Holyoke Checked roads for storm damage and clearing debris Wed. Apr. 25 Finished painting truck # 3 cab and putting on new air hose from valve on frame to air tank Repaired fuel tank key system panel Flipped cutting edge on Loader Crushed dumpsters at transfer station Thurs. Apr. 26 Jim out sick Put dump body on truck # 3 Worked on permitting issues for Old Winchester Rd. culvert Met with David Young to go over highway issues Fri. Apr. 27 Graded and rock raked Chestnut Hill Rd., W. Wilson Rd., Shepardson Pl. and a portion of White Rd. Cut down some brush at Wendell Rd. fill site to make more room for roadside cuttings Met with David Young to go over highway issues Sun. Apr. 29 Received call from Officer Kilhart at 5:45 P.M. of tree partially blocking Orange Rd. - personnel called in to remove tree