Warwick Highway Weekly Log Apr. 9 - 15, 2012 Mon. Apr. 9 Graded and rock raked Quarry Rd. Checked on tree near wires on Winchester Rd. - National Grid to handle problem Met with David on highway issues Replaced spring piston on Loader steering column Tues. Apr. 10 Graded and rock raked Buzzell Pl., Flower Hill Rd. and started Bass Rd. Patched pot holes on various roads Cleaned up heavy sand around village center that was raked off the lawn Crushed dumpsters at transfer station Wed. Apr. 11 Finished grading and rock raking Bass Rd., Hastings Pond Rd. and N. Holden Rd. Cleaned up heavy sand around fire station Marked out future projects and called in for dig safe permits Thurs. Apr. 12 Removed sander body off truck # 3 and began grinding and painting truck frame Received report from Officer Kilhart of two tires on Wendell Rd. just north of Hockanum Rd. on side of road - tires removed to transfer station and Police Chief notified Removed do not cut flagging ribbons from trees on Hastings Heights Rd. as we are done cutting brush on that road Swept sand off various box culverts and bridges Fri. Apr. 13 Hired sweeper in town to sweep school, village center and around Moore's Pond Continued working on grinding and painting truck # 3 frame Met with Tree Warden to go over and visit trees needing to be cut Went to Orange for supplies Continued sweeping up sand on various box culverts and bridges