Warwick Highway Weekly Log March 2 - 8, 2015 Mon. Mar. 2 Larry, Jim, Brian and Brian in at 2 am to start plowing due to 2 in. snowfall Plowed and sanded all roads finished about 8:30 am Washed Truck #3, Truck #4 and Loader Changed work light on Truck #2 Tues. Mar. 3 Mixed sand salt and dirt road mix for up coming storm Picked up pea stone for dirt road mix Inspected all equipment Brian Hubbard and Brian Miner back in at 6:15 pm to sand paved roads finished at 9:15 pm Wed. Mar. 4 Larry D., Jim B., Brian H. and Brian M. in at 2 am to mount plows and start plowing, all roads plowed and sanded, Paved roads finished by 5 am, dirt roads finished by 7 am Washed all trucks Cleaned up snow around yard and transfer station Performed minor repairs to Truck 4 Mixed sand salt for possible overnight snow Replaced Entry latch for rear door of truck garage Thurs. Mar. 5 Backhoe out to make drain holes thru snow banks at Orange Rd. bridge and other places as needed Patching potholes Pushed back snow banking at Richmond Rd. Fri. Mar. 6 Brian Miner out Minor repair to plow on Truck #4 To Lane to pick up bulk load of cold patch to use Monday Sat. Mar. 7 Sun. Mar. 8