Warwick Highway Weekly Log March 23 - 29, 2015 Mon. Mar. 23 Patching potholes To Porter Diesel Service for part for Truck 2 Tues. Mar. 24 Changed thermostat on Truck 2 Worked on heater on Truck 2 Wed. Mar. 25 Finished work on Truck 2 heater Washed Backhoe and Truck 3 Checked roads Larry D. came in at 7:30 pm to check roads due to rain and sleet determined no need to sand Thurs. Mar. 26 Checked dirt roads on the way in this morning found to be ok Performed service on Truck 3 Changed filter on diesel fuel tank Checked dirt roads, found weight limit sign missing on Gale Rd. and Royalston Rd. Fri. Mar. 27 Worked on adjusting tailgate on Truck 2 Sanded section of Chestnut hill Rd. and Quarry Rd. Sat. Mar. 28 Larry D. and Jim B. in at 8 am to sand paved roads due to flurries of heavy wet snow about 1 in. Sun. Mar. 29