Warwick Highway Weekly Log March 16 - 22, 2015 Mon. Mar. 16 Placed 1 1/2 in stone into mud spots on Quarry Rd. Started putting up weight limit signs on dirt roads Tues. Mar. 17 Sanded Quarry Rd Finished placing weight limit signs on dirt roads Picked up load of cold patch at Lane Larry attended round table discussion of Vermont Yankee drill at fire station Wed. Mar. 18 Out patching potholes Thurs. Mar. 19 Brian H. out Patching potholes and checking roads Fri. Mar. 20 Brian H. out Repair to Truck 1 dump body electrical system Went to Lane's to pick up bulk cold patch Larry D. and Jim B. in at 4:45 pm to sand paved roads due to flurries making roads slick finished at 8 pm Sat. Mar. 21 Larry D. in at 7 am to check roads found most roads ok but hills and cold spots were slippery. Called Brian H. and Brian M. in to sand paved roads at 8:45 am finished at 11:45 am Sun. Mar. 22