Warwick Highway Weekly Log Mar. 14 - 20, 2011 Mon. Mar. 14 Jim on comp day Crushed dumpsters at transfer station Pete's Tire came to fix leaking tire on Backhoe Checking all roads for conditions Opened up lower W. Rum Brook Rd. for seasonal resident Worked on maintenance repairs on Backhoe Tues. Mar. 15 Did some gravel repairs on various roads Did some rip rapping of washouts on various roads Wed. Mar. 16 Pete's Tire came back to fix leak on Backhoe tire again Put new fan blade on backhoe Cleaned up equipment and garage area Spot sanded roads due to freezing rain Thurs. Mar. 17 Jim on comp day Did rip rapping of washouts on various roads Did patching of various paved roads Fri. Mar. 18 Cut pavement on Bliss Hill Rd. in preparation of culvert replacement Did some gravel repairs on various roads Finished patching pot holes on various roads Met with Tree Warden to mark hazardous trees on Gale Rd. Re-installed Flower Hill Rd./Leland Hill Rd. sign Received report from Chief Shoemaker of tree down on Orange Rd. - tree removed