Warwick Highway Weekly Log Mar. 10 - 16, 2014 Mon. Mar. 10 Trip to get part for Backhoe Worked on Grader brakes Tues. Mar. 11 Installed new water pump and alternator on Backhoe Checked pole location on Gale Rd. Wed. Mar. 12 Pre storm maintenance on trucks Mixed sand salt Sanded dirt roads Checked landowner by pole location on Gale Rd for verizon engineer Checked utility crew working on Royalston Rd. found to be moving wires onto poles verizon finally relocated Thurs. Mar. 13 Went out sanding paved roads Plowed and sanded paved roads Fri. Mar. 14 Sanded dirt roads from yesterdays snow Porter's to pick up parts for Truck 2 Repair sander plate in back of truck 2 Replace helper spring bracket left side truck 2 Sat. Mar. 15 Sun. Mar. 16