Warwick Highway Weekly Log Mar. 9 -15, 2015 Mon. Mar. 9 Patching potholes Tues. Mar. 10 Checked roads for potholes Opened blocked drain on Hotel Rd. Started repairs to sweeper Wed. Mar. 11 Sanded Quarry Rd Checked roads for large puddles forming from melting, drained if possible Larry D. and Brian Miner at EOC for Vermont Yankee drill Thurs. Mar. 12 Work on Truck 2 fuel filters, found broken O-ring and debris in filter housing Trip to Porter Diesel for part Fri. Mar. 13 Changed Alternator belt and inspected for possible source of debris in fuel filter on Truck 2 Sat. Mar. 14 Sun. Mar. 15 Shelburne Control reported Quarry Rd in need of sand Brian Miner in at 9 am to sand Quarry Rd.