Warwick Highway Weekly Log Jan. 28 - Feb. 3, 2013 Mon. Jan. 28 Continued working on replacing Backhoe pins and bushings Went to Orange and Athol for parts Tim went on fire call Began sanding all paved roads at 12:45 P.M. - began mixing with sleet and freezing rain at 3:30 P.M. - plowed and sanded all main roads at 4:45 P.M. - called in privates and plowed and sanded all remaining roads - went home at 10:30 P.M. - 2" of snow with sleet and freezing rain mixed in Tues. Jan. 29 Called in personnel to sand all dirt roads at 4 A.M. Plowed slush off all paved roads as needed Continued working on replacing Backhoe pins and bushings Replaced right spinner shaft and bearings on truck # 3 sander Received call from Shelburne Control at 8:30 P.M. that Rt. 78 was icy due to freezing drizzle - called in personnel to sand all roads - went home at 1:45 A.M. Wed. Jan. 30 Sanded all roads due to continued freezing drizzle and freezing fog Truck # 2 broke down with a blown power steering hose - repairs were made Went to Winchester for parts Washed out both sand trucks Thurs. Jan. 31 Checked all roads for wind and rain storm damage Fri. Feb. 1 Unplugged culvert on Flower Hill Rd. at Buzzell Pl. Went to Milford, N.H. for Backhoe parts Went to Keene for sander parts Repaired minor washouts on various roads in town Continued working on replacing Backhoe pins and bushings