Warwick Highway Weekly Log Feb. 17 - 23, 2014 Mon. Feb. 17 Holiday Brian H. and Larry in to push back snow banks, finished Old Winchester Rd., Robbins Rd., Athol Rd. and Richmond Rd. Tues. Feb. 18 Minor repairs to grader and loader Grader and loader to Gale Rd. and Beech Hill Rd. to push back snow banks Backhoe to Pine St to move snow pile at end of st. Pushed back snow pile at end of East Wilson Sanded all roads due to start of snow Received delivery of cold patch, placed in garage Plowed and sanded paved roads due to 2 in. snow, finished at 10 pm Wed. Feb. 19 Went out and sanded all dirt roads Scraped Hastings Pond Rd Cleaned snow around yard Truck 2 to Porter Diesel Repair for work on rear springs Received one load salt Plowed and sanded all roads due to 4 in. snow (No Truck 2) Thurs. Feb. 20 Plowed out school Grader and loader out to push back snow banks Called Porter's Diesel Repair to check status of Truck 2 Backhoe out to clean up intersections Trip to Porter's to pick up Truck 2 Trip to Schmidt Equip. to pick up part for loader Fri. Feb. 21 Came in at 3 am to sand paved roads due to 3/4 in. snow and freezing rain Changed shift selector switch on loader Work on plow on Truck 4; changed plow solenoid Plowed slush off all paved roads, dirt roads too soft to plow, sanded all roads, finished about 7:15 am Sat. Feb. 22 Brian and Jim in at 3 am to sand all roads due to falling temps overnight, finished about 7:45 am Had to repair broken air line on truck 2 during sanding Sun. Feb. 23