Warwick Highway Weekly Log Feb. 10 - 16, 2014 Mon. Feb. 10 Brian and Jim in at 2:30 am to sand paved roads due to 1/2 in. new snow Mix sand salt Repair plow from truck 3 Scrape loose slush from main roads Tues. Feb. 11 Widened entrance to school Trip to H.P. Fairfield to set up controls in cab as per our requirements Wed. Feb. 12 Sanded dirt roads Mixed sand salt Pre Storm inspection and repair of equipment Thurs. Feb. 13 Sanded all roads Started plowing at 12 pm Continued plowing and sanding Fri. Feb. 14 Continued plowing and sanding Finished final sanding of all roads at 3 pm Sat. Feb. 15 Brian and Jim in at 11 am to sand roads Came in at 7 pm to start plowing, continued until 12 am Sun. Feb. 16 Finished sanding and plowing at 3:45 am Brian H. and Larry back in at 7:30 am to start pushing back snow on dirt roads to widen Stopped at 1:15 pm due to road grader breakdown