Warwick Highway Weekly Log Dec. 31, 2012 - Jan. 6, 2013 Mon. Dec. 31 Sanded all dirt roads and spot sanded paved roads as necessary Plowed all snow drifted areas and scraped off main roads Plowed out transfer station and sanded Washed both sand trucks and both 1-ton trucks Tues. Jan. 1 Holiday Wed. Jan. 2 Worked on exhaust system and hydraulic leak on truck # 3 Changed cutting edge on plow # 3 and plow # 4 Cleaned up snow around center of town Went to Orange for supplies and Winchester for parts Thurs. Jan. 3 Repaired hole in floor of truck # 3 on passenger side Replaced plow lights on truck # 1 plow Fri. Jan. 4 Did service on Loader Replaced vacuum hose to turbo unit on truck # 2 Replaced muffler on truck # 3 Received report of snow drift on Shepardson Rd. - plowed off snow drift Sun. Jan. 6 Called in personnel at 4 A.M. to sand all paved roads due to " of snow - went home at 7 A.M.