Warwick Highway Weekly Log December 29, 2014 - Jan. 4, 2015 Mon. Dec. 29 To Athol Rd. to clean up tree debris down since thanksgiving storm but tangled with Verizon wires, wires finally moved To Orange Rd. to check run off into roadway, spoke to land owner will fix problem asap Tues. Dec. 30 Met with Verizon Pole setting crew about pole at intersection of Athol Rd. & Royalston Rd. fixed location Dropped chipper knives off at O'Dell's for sharpening Wed. Dec. 31 Larry day Chipping downed branches on various roads around town Thurs. Jan. 1 Holiday Fri. Jan. 2 Larry day off Continuing cleanup of trees and branches broken by storm Sat. Jan. 3 In at 4 Pm to sand paved roads due to start of snow Larry in at 6 Pm to monitor storm transition from snow to freezing rain to rain Sun. Jan. 4 Started plowing at 1am when freezing rain ended about 1 in of snow on the ground. Plowed and sanded all roads finished about 9 am. Back in at 4 pm to scrape and sand paved roads due to expected daytime warm up not occurring.