Warwick Highway Weekly Log December 1 - 7, 2014 Mon. Dec. 1 Base Radio antenna pulled off the building by snow coming off the roof Started clean up of downed trees around town. Worked on Winchester Rd. then south on Orange Rd. Went to cemetery to open roads for burial at the request of Dave Shoemaker, already done on arrival Moved tree out of the road on Northfield Rd. Tues. Dec. 2 Finished storm clean up on Orange Rd then went to Athol Rd. Installed new Mirror bracket Truck 3 broken on Gale Rd. branches Picked up new windshield wiper transmission arm for Truck 2 Pushed wood out of the road Wendell Rd. Sanded section of Wendell Rd. that had been blocked by downed wires Wed. Dec. 3 Sanded paved roads due to overnight snow Cut small trees out of the road on Northfield Rd. Washed Loader and all trucks Installed new wiper transmission arm on truck 2 Thurs. Dec. 4 Went to Wendell Rd to remove snag from over road then work on clean up of wood along Wendell Rd. Fri. Dec. 5 Brian Miner responded to a medical call Changing knives in chipper Moved dead porcupine out of road on Athol Rd. Storm clean up on Gale Rd. and Richmond Rd. 9 Pm Sanding paved roads due to snow and freezing rain Sat. Dec. 6 3 Am Sanded all roads due to continued rain and temp. at 32 degrees Larry D. in at 3 am to check roads Sanded Transfer Station when finished with roads Larry D. in at 10 pm to check roads Sun. Dec. 7 3 Am Sanded all roads due to rain and temps falling below 32 degrees