Warwick Highway Weekly Log Jan. 16 - 22, 2012 Mon. Jan. 16 Holiday Tues. Jan. 17 Personnel came in at 3 A.M. to sand all paved roads - called in private contractors and began plowing and sanding all roads at 6 A.M. - one private contractor broke had a plow break and was out of service - finished plowing and sanding at noontime - 2" of snow Crushed dumpsters at transfer station Picked up truck # 4 from Fairfield's from being repaired Picked up brush chipper from Porter's Diesel from being repaired Received call from Shelburne Control at 5:45 P.M. of icy conditions on Old Winchester Rd. - called in personnel to sand all dirt roads due to rain - went home at 8:45 P.M. Wed. Jan. 18 Spot sanded all paved roads due to icy conditions Brought truck # 4 back to Fairfield's to have problem looked at Graves Fire came to replace tested and recharged fire extinguishers in highway garage and fire station Changed cutting edges on plow # 2 and # 3 Checked roads for tree markings on tree hearing tonight Tim went to MEMA meeting in Agawam relating to Oct. snowstorm briefing for FEMA reimbursement Received call from Shelburne Control at 4 P.M. of tree down on Northfield Rd. - tree removed Tim went to tree hearings on Orange Rd., Hastings Heights Rd. and Beech Hill Rd. Thurs. Jan. 19 Changed oil and filters in truck # 1 and # 4 plows and replaced solenoid # 2 on plow # 1 Repaired plow lights on truck # 1 plow Discovered Richmond Rd. street sign knocked over by unknown vehicle - reported to Police Dept. - sign straightened and put back in place Finished cleaning up tree that came down last night on Northfield Rd. Prepped equipment for snow storm Fri. Jan. 20 Called in private contractors and plowed and sanded all roads due to 2" of snow Went to Worcester to get sander chain for truck # 3 Police Dept. reported truck stuck on Old Winchester Rd. - sent out sander to assist Repaired left piston on plow # 1 Washed equipment and prepped for tomorrow's storm Went to Fairfield's to pick up truck # 4 Sat. Jan. 21 Called in personnel to get plows on trucks - called in private contractors at 1 P.M. and began plowing and sanding all roads - went home at 7:30 P.M. - 2" of snow