Warwick Highway Weekly Log Dec. 5 - 11, 2011 Mon. Dec. 5 Began cutting brush on Orange Rd. south of the old Brush Valley Rd. Spoke with EMD, Jim Erviti, on National Grid issues Tues. Dec. 6 Began grinding and painting Backhoe Repaired heating system on truck # 4 Serviced chainsaws Began marking trees on Hastings Heights Rd. for cutting plan for future tree hearing Crushed dumpsters in transfer station Wed. Dec. 7 Finished scraping and painting Backhoe front-end area and front bucket Working on brake light problem on Loader - ordered part Checked beaver areas for any problems Prepped trucks for snowstorm Thurs. Dec. 8 Called in personnel at 1 A.M. to sand all paved roads - called in private contractors at 4:30 A.M. and plowed and sanded all paved roads - 2-3" of heavy, wet snow Sander belt on truck # 2 broke during storm - removed belt and ordered new one Cut up several trees that fell during storm on various roads Repaired moderate washout on lower Chestnut Hill Rd. Fri. Dec. 9 Checked all roads for storm damage Had meeting with National Grid representative, Fire Chief Gates, Police Chief Shoemaker and EMD Jim Erviti to go over National Grid storm related issues to be better prepared in future events Washed trucks