Warwick Highway Weekly Log Oct. 31 - Nov. 6, 2011 Mon. Oct. 31 Finished clearing dirt roads of snow Cleared trees on Winchester Rd. and opened road per EMD Director Cleared out the transfer station Met with EMD Director coordinating road conditions multiple times during the day Tues. Nov. 1 Began chipping up brush and removing dangerous trees on Rt. 78 Power returned to Hwy. Garage at about 11 A.M. but still without phone service EMD Director closed the EOC Center at the Fire Station at noontime Went to Athol for parts Wed. Nov. 2 Checked out hole in road on Winchester Rd. south of Robbins Rd. - found to be collapsing culvert - Conservation Commission notified and signed off on Emergency NOI as did the Police Chief - culvert to be replaced tomorrow Picked up Police Chief in Orange after he dropped off Police cruiser for repairs Cut pavement on Winchester Rd. for culvert replacement tomorrow Went to Burlington, Vt. to get necessary culvert pipe for Winchester Rd. replacement tomorrow Thurs. Nov. 3 Replaced culvert # 20 on Winchester Rd. Fri. Nov. 4 Bill out sick today Finished culvert work on Winchester Rd. Called Verizon and National Grid about trees on wires and phone outage in town - still have no phone at highway garage Washed trucks and Backhoe Touched up chainsaws from all the cutting we have done Received report of dip in gravel on Quarry Rd. - filled dip with gravel