Warwick Highway Weekly Log Nov. 18 - 24, 2013 Mon. Nov. 18 Continued replacing guardrail posts on Northfield Rd. Tues. Nov. 19 Cleaned up freon items at transfer station, placed items in metal dumpster Continued replacing guardrail posts on Northfield Rd. Wed. Nov. 20 Finished replacing guardrail posts on Northfield Rd. Cleaned up around basins on Northfield Rd. between Leland Hill rd. and White Rd. Thurs. Nov. 21 Installed new street sign at Kirk Rd. to replace sign that was stolen Cleaned ditch line on Northfield Rd. near Spooner Rd. Fri. Nov. 22 Performed service on chipper Repaired hydraulic leak on Backhoe Sat. Nov. 23 Brian H. & Jim B. called in to sand paved roads Sun. Nov. 24 Larry D. in at 6 am to drive roads and check conditions Jim B. & Larry D. tree blocking road on Chestnut hill Rd.