Proposed Agenda for WBEC next mtg. Wed Feb 17 Announcements? Town Hall: Any feedback from occupants this winter? Go over punch list (see below) and plan for future work Storm window update - Jack Solar system update - Steve: new Commonwealth solar program & does it apply to us Re-roof of not before solar system? Any items for town mtg? Warwick School: Installing the data loggers - done yet? our call? Touch base with Siemens? Get the new maintenance man involved? Fire Station: How to help with winserts? Any news from Highway dept or Library? Hot potato: Stretch code feedback (attachment) Town Hall repair list as of Feb 2010 roof replace/repair before solar system installation east & south chimney needs blocking on top front door closure may still need attention. also needs weather-sealing outside door in the kitchen needs a new sweep and some attention to rust gable vent in attic needs to be rebuilt with screen/louvers elec. box in attic over hall light needs to be closed make list & repair missing exterior clapboards and rotted sections concrete repair for bulkhead and window wells seal the furnace ducts in the basement with mastic & tape as needed kitchen chimney - chimney should be parged - need mtrl & bonding agent for 40 sq ft at " thick (buy at Shanahans') have sheet rock screws, joint compound, and masking tape make and install more winserts for the main hall and backstage