Warwick Buildings and Energy Committee draft minutes Jan 30th, 2013, at 6:17 pm Attending: Bart Bales, Jack Cadwell, Dan Dibble, Janice Kurkoski, Steve Kurkoski, David Young WARWICK SCHOOL Equipment / Options All the heat delivery units are in a line in the attic. Currently there are two units outside the thermal envelope. Bart is suggesting that we extend the thermal barrier to include the two units and keeping the thermal boundary where it is. This option will have a shorter payback then moving the thermal boundary to the roof rafter location. If we are concerned about too much heat in the attic (shingle warranty) then a thermostatically controlled attic vent can be installed. A contract can be written for any future work that is performed. This would state that all penetrations in the thermal boundary will be sealed by the contractor before the final payment to them is made. At some point Bart would like us to have the delivery system checked to see if there is enough fan power to do an adequate delivery job of heat and fresh air. We first need to find out if the system has enough ability to deliver enough heat before we start to install new controls or equipment. We have a unusual sort of system in that we have an all air system. Usually with this type of system there is perimeter heating that goes along with it. We do not have perimeter heating in this building. It is possible that because we have 240/120 Volt service that we have residential grade equipment. Commercial grade equipment would have more options. Framing Statement and other considerations The best way to make an argument to the district is to shows that it costs less to implement energy upgrades than to do nothing. Bart says that if we bundle controls and envelope improvement together the package will look better (shorter payback than just envelope work) to the PVRS district. Six year or less payback is the time frame that public projects generally accept. We could have a 6 or 9 yr. payback scenario. We should illustrate in the Framing Statement how much money will be saved by each town per year according to the % they pay the district, and demonstrate that making an investment in operational payback is in everyone's best interest. It would be helpful if energy saving expenses could be categorized as operational expenses. Improvements that are a net reduction in operational expenses should be considered part of the operating budget and should be funded by the district. In our framing statement it may be helpful to summarize what the Franklin County Tech School did to lower their energy costs. David: Bart, let us know what the next step is. Meeting adjourned; 8:25 PM